Fulfilling the contractual conditions, last week, FRIZONIA has delivered the main AC equipment and materials for the the Air Conditioning and Ventilation systems of a Hydroelectric Plant that is under construction in Angola. The delivery time have been fulfilled with the satisfaction of the customer. |
|