FRIZONIA REFRIGERACION-CLIMATIZACION, S.L. has obtain by Dragados Offshore the contract to install a provisional system of air conditioning and presurization for the SNOHVIT Project. The objective of this installation is to guarantee a clean atmosphere in the room, to protect the value equipment to be installed inside. The system in level 1 has been already installed and the system in levels 2 and 3 is under development. |
Image courtesy of Dragados Offshore
|