FRIZONIA REFRIGERACION-CLIMATIZACION, S.L. is actually finalizing the Air Conditioning installation works on construction 534 of ASTILLEROS DE ZAMAKONA (SPAIN).
The turn key contract includes following works:
– Basic and final Engineering .
– Equipment’s manufacture and installation .
– Supply and installation of ductwork.
– Supply and installation of grilles, louvers and air inlets.
– Commisioning.