Thanks to a rigorous coordination of Engineering, Procurement and Production departments, FRIZONIA has been able to fulfill the tight deadlines required by the project and the past 16th of October, the equipment were delivered on time for the Mexican Navy.

The scope of supply includes three chilled water plants with power around 300 kW, and other HVAC equipment like Air Handling units, Control panels, fans, etc.