| FRIZONIA, through its subsidiary in Colombia, has been hired for the engineering, supply of equipment and components and commissioning of the air conditioning system of the new construction of a Pusher ship for Cotecmar.
It is a river pusher vessel with 33 meters long and 11.50 meters wide. The ship is a Cotecmar design and it is appropriate to advance the recovery of the Magdalena River. |
|
Ferias y eventos
Expodefensa 2025
Del 1 al 3 de diciembre estaremos en Bogotá (Colombia) para acudir una vez más a Expodefensa, La Feria Internacional de Defensa y Seguridad.




