| FRIZONIA has been selected to carry out the HVAC system as Turn-Key Project (Design, Engineering, manufacturing of equipment, installation and commissioning) for the 30.500 m3 Hopper suction dredge. The ship is under construction in the shipyard Construcciones Navales del Norte.
The vessel ordered by Jan de Nul Group (Belgium) is specifically designed for operation in shallow or confined waters, having a design draft of only 11m and a length between perpendiculars of only 161.5m. |
|