| FRIZONIA has been contracted for the Engineering, supply and Integrated Logistic Support in the distribution system for the Air Conditioning of Submarine S-81P for the Spanish Navy that is being built in Navantia in its Cartagena factory (Murcia). With a hull diameter of 7.30 meters, a maximum length greater than 81 meters and a displacement in immersion close to 3,000 tons, this is a submarine that incorporates very advanced technologies in their systems, whose integration imposes great difficulty. Due to the operating conditions, this project requires high training and high demands for quality control. |
|

Ferias y eventos
FRIZONIA impulsa su presencia internacional en el sector naval en Navalia 2026
FRIZONIA participó en Navalia 2026, la feria internacional de la industria naval celebrada en Vigo del 19 al 21 de mayo de 2026, dentro

