| At the end of last September, the sea trials of the new Maritime Action Ship «Furor» that is being built in the shipyards of Navantia in Ferrol (Galicia – Spain) for the Spanish Navy were carried out. These tests are intended to check the correct operation of all the ship’s systems during real navigation.
During the navigation, FRIZONIA has satisfactorily executed the tests related to the HVAC system of the vessel, verifying the operation and functionality of the equipment. These tests have been carried out in waters near the Navantia shipyard in Ferrol. |
Foto: Defensa |

Ferias y eventos
FRIZONIA impulsa su presencia internacional en el sector naval en Navalia 2026
FRIZONIA participó en Navalia 2026, la feria internacional de la industria naval celebrada en Vigo del 19 al 21 de mayo de 2026, dentro

