| At the end of last September, the sea trials of the new Maritime Action Ship «Furor» that is being built in the shipyards of Navantia in Ferrol (Galicia – Spain) for the Spanish Navy were carried out. These tests are intended to check the correct operation of all the ship’s systems during real navigation.
During the navigation, FRIZONIA has satisfactorily executed the tests related to the HVAC system of the vessel, verifying the operation and functionality of the equipment. These tests have been carried out in waters near the Navantia shipyard in Ferrol. |
Foto: Defensa |

Noticias
FRIZONIA impulsa la movilidad sostenible con el Programa MOVES III 2025
FRIZONIA Refrigeración-Climatización S.L. ha instalado un punto de recarga de vehículo eléctrico en sus instalaciones, en el marco del Programa de Incentivos a la

