|
FRIZONIA has obtained under «turn key» basis, the contract for the air conditioning, ventilation and exhaust systems for the three oceanic yachts under building in IZAR SAN FERNANDO (CADIZ-SPAIN). The contract includes: · Engineering · Equipment and ductwork supply · Installation and commissioning The first yacht is in final works. The second is in initial works. The third is in Engineering phase. |
|

Ferias y eventos
FRIZONIA impulsa su presencia internacional en el sector naval en Navalia 2026
FRIZONIA participó en Navalia 2026, la feria internacional de la industria naval celebrada en Vigo del 19 al 21 de mayo de 2026, dentro
